Client  LISEA

Project description Construction of a 340 km new high speed line between Tours and Bordeaux, 302 km of which will be high speed line and 40 km of which will be connected to the existing line.

TUC RAIL's assignment TUC RAIL, as part of a joint venture, is performing independent design verification services on all designs as well as critical checks during works execution.

Period 2011 - ongoing