Client  Wittfeld Gmbh

Project description Construction of a 44.5 km of high speed line between the French city of Perpignan and the Spanish town of Figueres. The trains on this line are intended to carry both passengers and freight at speeds of 350 km/h and 120 km/h respectively.

TUC RAIL's assignment  Provide technical assistance with regard to the execution studies for works carried out on the superstructure and railway equipment on the ballasted section in France.

Period  2007 - 2009