Client  Jan De Nul – Envisan

Project description  Maintenance flood control works on the Scheldt (Sigma plan) including the construction of a high-walled embankment between Vlassenbroekpolder and Termonde.

TUC RAIL's assignment  Validate geotechnical studies and provide assistance whilst the works are being implemented.

Period  2014