Client  NS Railinfrabeheer (Netherlands)

Project description   The Betuwe line is a 160 km new freight line connecting the port of Rotterdam to the German border.

TUC RAIL's assignment  Different: capacity analysis, audit the EC superstructure contract, simulate the separation of the electrification system and cost analysis, …

Period  1998 - 2003