Client GCF
Project description Realization of the second stage of the 106 km East European high-speed line, between Baudrecourt and Vendenheim
TUC RAIL's assignment TUC RAIL prepared the general arrangement design for Track and Overhead line as well as the lay-out drawings for the construction compound within the framework of the Design & Build tender to be introduced by the consortium led by GCF to RFF.
Period 2010
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |